Client: Nasr Consortium
Project: Seawater R.O Desalination Plant for EPC 1 PHASE 12
Capacity: 5.000 m3/day

One of the main components of EPC1 project in gas field phase 12, was production of potable water for employees and residents camps. The economical method for such case, designing, procurement and installation of one SWRO.
In 2010, Wahang Saran awarded  for above mentioned tender and finally qualified for such project.
This project includes, digging shore area well, transportation pumps, pressurized sand filters, 5μ cartridge filters, SWRO skids & dosing station for potable water demineralization.
The energy recovery system was turbocharger.